When are anchor points permitted?

Anchor points are only permitted once it has been demonstrably documented in writing that a permanent guardrail is technically not feasible on this roof. Only then do the 18 conditions below from Annex I of the V&G Ontwerpwijzer apply.

Source: V&G Ontwerpwijzer Annex I · Binding assessment framework for building control & the Netherlands Labour Authority

The conditions

Structural & technical

  • no. 16

    The attachment provision is part of the building structure and the structural calculation

  • no. 20

    The device is structurally attached to the building - attachment is part of the building structure and the structural calculation interpretation point

    For bonded anchor points (adhesive on the roof covering): the EN 795 certification of the product plus a project-specific installation file (substrate type, roof covering condition, installation conditions) together form the required equivalent of a structural calculation. This file is missing in most installations - verify it when requesting one.

  • no. 21

    The attachment to the object is durably protected against corrosion

  • no. 15

    Fall height greater than 6 metres everywhere - attention to pendulum effect is mandatory

  • no. 17

    Clearly visible structural attachment anchor points or fixing points present

Accessibility & working space

  • no. 2

    Safely accessible entry point and attachment point present (edge protection)

  • no. 11

    Safe accessibility of every attachment point ensured

  • no. 19

    Safe accessibility of the attachment point recorded in the building file

  • no. 13

    The roof surface is free of obstacles for the cable

  • no. 14

    All parts of the roof surface are accessible - detailed on drawings and in the building file

Documentation & file

  • no. 26

    The design detail is part of the design and the permit application

  • no. 12

    The line system is included in the building inventory

  • no. 10

    A Dutch-language manual is available and part of the building file

  • no. 34

    The device is part of the specifications; the file states which parts require maintenance

Inspection & maintenance

  • no. 9

    Checks, inspection and maintenance for 10 years are part of the specifications

  • no. 36

    Annual assessment arranged and safeguarded

  • no. 37

    Assembly, disassembly and foreseeable maintenance of equipment safely possible - preferably without individual protection

CWL Anker.

CWL Anker is a trade name of Nedersafe B.V.

Contact

© 2026 Nedersafe B.V. CWL Anker